Skip to main content

POT Approach Common Problems and Introduction to Waste Strength

ID : 1018   
« back to classes page
POT Approach Common Problems and 
Introduction to Waste Strength
June 29, 2018
Location: Fire and Ice Restaurant
        111 South Main Street
        Trucksville, PA 1878

Registration Deadline: June 22, 2018

SEO Credits:   8  hours total comprised of:
4 classroom, 3 field, 1 hour test
Course #113-0008

Registration: 8:15-8:30 AM

8:30AM-12:30 PM: Classroom Session
•  Review of Basic Ethics
• The POT Approach with Respect to Soils
   Evaluations
• Common Problems and Issues with Site and
   Soil Evaluations
• Getting it Right – Land-based Wastewater/
   Stormwater
• The Water Table – What and Where?
• Wastewater Mass Loading – Design
   Element                 

12:30-1:30 PM: Lunch (included)

1:30-4:30 PM: Field Session
Describe the physical properties of a soil (soil texture, structure, consistency, color), identifying soil horizons, and make interpretations related to the movement of water through the soil profile as it relates to on-site wastewater disposal and stormwater management.

Credit for completing the course will be awarded only to those sewage enforcement officers completing the classroom session, the field session  and the accompanying exam with a minimum score of 70%.
 

Class Details

1 Sessions
Weekly - Fri

Location
Fire and Ice Restaurant

Instructor
Brian Oram 

Tuition: 

$115.00


Registration Closes On
Wednesday, June 27, 2018 @ 12:00 AM

Schedule Information

Date(s) Class Days Times Location Instructor(s)
6/29/2018 - 6/29/2018 Weekly - Fri 8:30 AM - 4:30 PM Trucksville, Fire and Ice Restaurant  Map Brian Oram